ⓘ Baglan Bay power station. The power station was built on the site of the former Isopropanol BP chemicals plant in September 2003, costing £300m. At the time of ..

                                     

ⓘ Baglan Bay power station

The power station was built on the site of the former Isopropanol BP chemicals plant in September 2003, costing £300m. At the time of its development, it was considered the most advanced CCGT Combined-cycle gas turbine facility of its kind. It was built by the GE Energy division of General Electric, who are its current operators. It was sold by GE in October 2012 to a group of financial investors, led by Macquarie.

                                     

1. Specification

It is a CCGT-type power station that runs on natural gas. It has one General Electric H system 9H gas turbine with a heat recovery steam generator and a GE steam turbine. It has black start capability, using a 33MWe GE LM2500 gas turbine. It connects to the National Grid at 275kV. It is 60% thermally efficient.

Free and no ads
no need to download or install

Pino - logical board game which is based on tactics and strategy. In general this is a remix of chess, checkers and corners. The game develops imagination, concentration, teaches how to solve tasks, plan their own actions and of course to think logically. It does not matter how much pieces you have, the main thing is how they are placement!

online intellectual game →