1. History

Construction of this power station began in October 1994 and was completed and started producing electricity in December 1997. The owners of the plant, TXU sold the plant to Centrica in October 2001.

The plant was mothballed on 1 April 2012 as older, less efficient, plant such as Kings Lynn had become uneconomic due to high gas prices.

                                     

2. Description

The Combined cycle gas turbine power station is located on Willows Business Park, Saddlebow, Kings Lynn and uses gas from National Grids National Transmission System.

Environmental performance

In 2006 it generated 900 GWh and emitted the following pollutants:-

  • Methane: 26.000 tonnes
  • Nitrogen oxides: 310.000 tonnes
  • Sulphur Dioxide
                                     

2.1. Description Original Specification

The station was built with one single shaft 237 MW Siemens V94.3 Gas driven Turbine with electrical generator running at 3.000 rpm. The terminal voltage is 21 kV. There is a vertical type triple pressure heat recovery steam generator designed by CMI SA Belgiumand supplied by CMI SA and International Combustion (since 1997 known as ABB Combustion Services Ltd. The plant has one steam turbine that is coupled to the generator via a self synchronizing clutch. The plant was built with one air cooled condenser which compromises of 61 cooling modules of fins, tubes and fan arranged in four by four configuration, connected to the 132 kV electrical distribution system. The original output of the station was 325 MWe. The power station employs around forty-one staff.

Free and no ads
no need to download or install

Pino - logical board game which is based on tactics and strategy. In general this is a remix of chess, checkers and corners. The game develops imagination, concentration, teaches how to solve tasks, plan their own actions and of course to think logically. It does not matter how much pieces you have, the main thing is how they are placement!